Renault TWIZY Z.E. Specifications Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 111
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
Jaune Noir Noir texte
1.9
ENG_UD27229_5
Charge batterie (X09 - Renault)ENG_NU_913-3_X09_Renault_1
ELECTRIC VEHICLE: charging (3/5)
Charging cord 2
This cord enables a full recharge of
the traction battery in approximately
3.5 hours.
The cord is located in the storage com-
partment at the front of the vehicle.
Do not use an extension
lead or a multiple socket.
Only use an adapter ap-
proved by the construc-
tor. Please contact an authorised
dealer.
Fire hazard.
2
Avoid charging and parking your ve-
hicle in extreme temperatures (hot or
cold).
When the outdoor temperature is lower
than approximately -15°C, the traction
battery charging time may be longer.
Charging may become impossible
when the temperature is extremely low.
Favour charging the traction battery
after driving and/or in mild tempera-
tures. Otherwise, charging may take
longer to complete.
Recommendations
Favour parking and recharging the ve-
hicle in a shaded/covered location.
In the absence of any protection
against overvoltage, you are ad-
vised not to charge the vehicle in
stormy weather (lightning, etc).
Wear to the charging cord
protective sleeve.
The charging cord must be
replaced in the event that
the blue protective sleeve
is damaged. Please contact
an authorised dealer.
Risk of serious injury and/or electric
shock which may endanger life.
Always check that the
socket is clean, dry and
shows no signs of rust
before plugging in.
Risk of serious injury and/or electric
shock which may endanger life.
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 110 111

Comments to this Manuals

No comments